您的位置:首页>News>Brand dynamic>Matters needing attention and installation details in the selection and purchase of Electric heating Film floor heating
2019-08-22

Matters needing attention and installation details in the selection and purchase of Electric heating Film floor heating

分享到

      Now electric heating film floor heating market can be said to be dazzling, every year there will be a few new "electric heating film manufacturers", so how can we choose to buy good quality and affordable products?

 

Selection and purchase method of electric heating film floor heating

 

1. Choose the brand

 

       In the selection, the floor heating brand is a very important factor, not only because the quality of its products is more guaranteed, its after-sales service can also be better guaranteed. And Wenfeng electric heating has more than 20 years of research and development and production experience, the electric heating film heating can be said to be "time-honored".


201907151629046736.jpg


2. Choose the price

 

       People say, "one penny, one penny." the price of the product is determined by material quality, craftsmanship, and so on. Choose one with a high price, relatively good quality, and a longer service life. It plays a key role in reducing the cost of maintenance in the later stage.

 

3. Power selection

 

      If the area of the house is different, the power of the heater will be different. According to the general residential, 1 kilowatt power can drive the heating area of about 10 square meters.

 

4. Selection services

 

    Service is also one of the factors that feel product quality assurance. Perfect after-sales service will reduce a lot of worries, so that consumers in the use process more comfortable.

 


Installation method of electric heating film floor heating. 


1. Determine the location of the thermostat and junction box


      The first thing a family needs to do in installing an electric heating film heating system is to determine the location of the temperature controller and the junction box. This step needs to be designed according to the requirements of the electric heating film heating system, and leave space for the installation of wires and grooves on the wall. At the same time, we should find out the area where the thermostat and junction box are most suitable to be installed in the room, and clear out the thermostat slot, junction box slot and wire slot.


201907241514323927.jpg


2. Moisture proof layer and Insulation layer pavement

 

       Whether the indoor temperature is warm or not is closely related to whether the moisture-proof layer and insulation layer are installed successfully or not. The second part of the installation of electric heating film heating system is the installation of moisture-proof layer and insulation layer. When installing the moisture-proof layer, the rubbish on the indoor ground should be cleaned out first. In the room with moisture-proof needs to lay the moisture-proof layer, the material of the moisture-proof layer is different, users can choose the moisture-proof layer that suits their needs. After the moisture-proof layer is laid, the insulation layer can be laid, and the gap between the insulation boards should be as small as possible, so that a good thermal insulation effect can be obtained. The insulation board should be square as far as possible, and each size should maintain a fixed specification. After laying, there should be no upwarping or bending.


3. Pavement electrothermal film and overheat protection system

 

       After completing the above steps, it comes to the most important link in the installation of the electric heating film system, that is, the installation of the electric heating film and the overheating protection system. The electric heating film system is the key to heating, and the overheating protection system is the guarantee for the safety of the electric heating film system. Before installing the electric heating film, pay attention to keeping the insulation clean. The installation position of the electric heating film should be in strict accordance with the design requirements to remove the appropriate wire installation slot on the insulation board. The electrothermal film should be laid as flat as possible. The overheat protection system should also be in strict accordance with the design requirements. After the completion of the pavement, there should be professionals to test the electric heating film and overheating protection system to see if there are any anomalies. If anomalies are found, they should be eliminated in time.


4. Pavement protective layer

 

After the electric heating film is installed, the surface of the film is arranged to prevent dust, confetti and other dirt. After that, install the protective film. The protective film should be completely covered by the electrothermal film, the edge of the protective film should be kept sealed and can be sealed with tape. After the protective film has been installed, a metal mesh shall be installed. The edge of the metal mesh should not be in the electrothermal film, it is appropriate to exceed the electrothermal film. The metal mesh should be parallel to the electrothermal film, and the professional installer should connect the protective ground wire to the metal mesh, and the metal mesh itself should also be connected. 


After completing the above steps, it is a comprehensive test of the whole heating system, as well as debugging and troubleshooting of the system itself. Soon, you will experience the warmth of the sun.